Home Products Safety Frequently Asked Questions Support Distributors Click to contact us
 

Features
Benefits
Models
Colours
Specifications
Testimonials
Enquiry
Careers

Sahyadri Industries Ltd
 
Interested in becomining a Entasafe Dealer - Mail us at sales@entasafe.com
 
Entasafe main doors are easy to install and have normally low maintenance . Please find below basic instructions that will give you excellent protection by Entasafe doos for many years. For specific queries and issues feel free to contact out Technical Support Cell.
 
Technical Support Cell
Mr Kailash Diwate
Technical Support Incharge
CELL : 09371669494, - 020 26444625 / 26 / 27
em@il - techsupport@entasafe.com
 
FIXING & INSTALLATIONS
Ensure correct opening specification (left or right) before placing the order and installing the door.
The clearance provided shall be plumb & without any undulation.
A clearance of 5 mm shall be provided more than the size of the door.
E.g : For 2100 mm x 960 mm, the clearance should be 2105 x 965 mm
Install Entasafe plumb level and in true alignment.
Frame shall be fastened (using anchor fastener) to the adjacent structure to retain their position and stability. Use 3” long 12 mm. dia fasteners preferably and a drill bit of 12 mm. to create necessary hole in the wall.
Adjust doors for proper operation, free from any defects.
Fill frame with grout. Grout (optional) shall be mixed to provide a 102 mm or 4 inch max. slump consistency.
Entasafe should be installed preferably after flooring work is complete.
Gaps between frame and retaining wall, if any, may be filled with Fischer multi foam.
 
MAINTENANCE
Check the hinges regularly to see if they seem to squeak. If they do, use light weight household (sewing machine) oil to lubricate them in working order.
 
CLEANING
Remove dirt and take a mild detergent at a concentration of 1 cup in 20 ltr. of warm water.
Rinse with clean water after washing and allow to dry completely. Wipe the surface using dry cloth.
Polish with wax suitable for automobile use.
 
PRECAUTIONS DURING STORAGE
Stock vertically under cover at the site or in godown.
Do not use non-vented plastic or canvas shelters.
Should the wrappers become wet, remove and replace immediately.
Provide 1/4 inch (6mm) space between doors to promote air circulation.